Work Schedule — Fixed Weekly (Σταθερό Εβδομαδιαίο)
Used for all dependent-employment relationships with a weekly schedule
that stays constant. Submission code: WTOWeek.
Available from:
ΕΝΤΥΠΑ ΣΕΠΕ → Ψηφιακή Οργάνωση Χρόνου Εργασίας → Εισαγωγή
When to use it
Use Fixed Weekly when an employee's Monday–Sunday pattern doesn't change from week to week. If it does change (shift work, rotating patterns, ad-hoc modifications), use Variable / Modified Per-Day instead.
Effective date range
- Ημερομηνία Εφαρμογής Ωραρίου Από (required) — start date.
- Ημερομηνία Εφαρμογής Ωραρίου Έως (optional) — end date.
- If omitted, the schedule is considered to apply indefinitely ("στο διηνεκές") and automatically continues to be shown in the Current Status calendar for the following month, until a new declaration supersedes it.
Form structure
Basic declaration fields
- Εργοδότης (Employer)
- Παράρτημα (Branch)
- Ημερομηνία Υποβολής / Αρ. Πρωτ.
- Ημερομηνίες Εφαρμογής Ωραρίου: Από (required) / Έως (optional)
Per-employee fields
- Προσωπικά Στοιχεία: ΑΦΜ, Επώνυμο, Όνομα
- Ημέρα Εβδομάδας (Δευτέρα – Κυριακή) and the Day Occupancy Analysis for that day
Day Occupancy Analysis (Ανάλυση Απασχόλησης Ημέρας)
For each day of the week, four entry types are available:
| Type | Description |
|---|---|
| Εργασία (Work) | with start/end time (ώρα από / έως) |
| Τηλεργασία (Telework) | with start/end time (ώρα από / έως) |
| Ανάπαυση / Ρεπό (Rest day) | — |
| Μη Εργασία (Not working) | used for part-time or rotational employment |
Rules
- All seven days of the week must have an entry.
- Multiple entries per day are allowed — useful for split shifts (e.g. morning + evening blocks) or a mix of Work + Telework on the same day.
Ανάπαυση/ΡεπόandΜη Εργασίαcannot be combined withΕργασίαorΤηλεργασίαentries on the same day — a day is either a work day (with one or more work/telework intervals) or a rest/non-working day, not both.
Bulk entry via XLSX
You can submit Fixed Weekly schedules for one or more employees by attaching
an XLSX file (EXCEL_PROTOTYPE_WEEKLY.xlsx, see
Reference: Environments & Companion Files).
Note: uploading a file deletes existing records for the declaration —
see the relevant FAQ entry.
Companion files
| Action | File type | Filename |
|---|---|---|
| XML upload | XSD | WTO_Weekly_v1.xsd |
| XML upload | XML example | WTOWEEKLY.xml |
| Web API (JSON) | JSON example | WTOWEEKLY.json |
| Excel bulk upload | XLSX example | EXCEL_PROTOTYPE_WEEKLY.xlsx |